Monday, April 18, 2011

Department operation of SEV plant

Go to the fuel oil forwarding and unloading station to help on calibration of tank oil level before fuel oil is unloading from tanker.learn from technician some theory about the main cooling water system which using the sea water for cooling the steam at the condenser. Go to GT-23 of sev plant to observe on how technician doing on changing the fuel gas to fuel oil on the gas turbine for the gas turbine.besides that, learn some important step on changing the gas to oil of the gas turbine.
Given the task on helping to design and calculation for the competition of the mechanical power vehicle by Mr. Tan (Section head-Technical Training).
The task of the design is to carry out on calculation of strength, force, pressure, gear ration and the spring rate and some failure analysis of the material of the vehicle.Finish on the calculation of the design in three days.

No comments:

Post a Comment