At department operation of SEV plant

Visit to the Heat Recovery steam Generator (HRSG) guide by the operation technician and learn on the High pressure drum and low pressure drum which part of the boiler (HRSG) and know of the safety equipment use on the HRSG such as the gauge glass and the safety valve. Beside that, we also learn on how to isolate evaporater drain valve for the boiler guide by the operation technician. we also visit to the mail cooling water system which using sea water for the condenser, FWT-deaerator system, high pressure and low pressure feed water system and also high pressure and low pressure steam by-pass system for the boiler (HRSG)guide by technician.

overview of the sev plant of gas turbine GT-22 at the plant E-module room, and observe on how the gas turbine is start done by operation technician at the E-module room and also have brief idea on synchronise the voltage before the generator is attach to the transformer which are going to supply to TNB.

Going to the fuel oil forwarding & unloading station learn on how the fuel oil is unloading from the tanker to the Oil tank. Besides that , we also learn on how the process of order the fuel and the responsible of the Operation Engineer (OE) is to observe the level of the fuel and order the oil fuel. Going to the compressor machine to help on cleaning the leaking oil and top- up the cooling oil for the machine.


Heat Recovery steam Generator (HRSG) at the top of the SEV plant


Gauge glass which use to ensure the safety level of the HRSG boiler



Fuel unloading from the tanker at the fuel oil forwarding & unloading station