overview of the sev plant of gas turbine GT-22 at the plant E-module room, and observe on how the gas turbine is start done by operation technician at the E-module room and also have brief idea on synchronise the voltage before the generator is attach to the transformer which are going to supply to TNB.
Going to the fuel oil forwarding & unloading station learn on how the fuel oil is unloading from the tanker to the Oil tank. Besides that , we also learn on how the process of order the fuel and the responsible of the Operation Engineer (OE) is to observe the level of the fuel and order the oil fuel. Going to the compressor machine to help on cleaning the leaking oil and top- up the cooling oil for the machine.

Heat Recovery steam Generator (HRSG) at the top of the SEV plant

Gauge glass which use to ensure the safety level of the HRSG boiler

Fuel unloading from the tanker at the fuel oil forwarding & unloading station