Monday, April 4, 2011

Internship at Lumut Power Plant

First Day at Lumut Power Plant(segari).

Training office at Lumut Power plant

Today is my first day internship at Lumut Power Plant segari. Technical training staff give us brief on the background on the power plant and let us know about the power which supply by the power plant and some brief introduction of the power plant such as technical data of the power plant. Lumut power plant is the largest combined cycle gas turbine (CCGT) in Malaysia which generate 1943MW.Lumut power plant consist of three plant which is two SEV plant and 1 GB3 plant which generate 1303MW for the 2 SEV plant and 640MW.

Beside that, we also listen on the briefing on the safety rule at the power plant for example DO and DONTS in the power plant and also emergency exit place to meet at the emergency.


Me at Lumut Power Plant


View of Lumut power plant (SEV Plant)

3 comments:

  1. Hello..
    juz asking..
    how do u apply internship at Lumut power plant?
    online or mail..?
    i'm interest to apply there to0..
    my internship starting october..
    i would like to apply as soon as possible..

    u can reply to me thru my emel: hanifshamsudin@hotmail.com

    tqvm 4 ur time..

    ReplyDelete
  2. This comment has been removed by the author.

    ReplyDelete